Finally I have made a simple layout of THE petroleum pipeline. Remember, its a petroleum pipeline not the gas pipeline.
In this simple layout/design the pipeline construction is divided into 5 phases which should be constructed one after another.
Phase 1 (Raxual to Amlekhganj)
It is said that upto Raxual(Bihar), there is pipeline of petroleum. From there the pipeline should be constructed upto Amlekhganj. It should have been Heatauda instead of Amlekhganj but due to high settlement and also an industrial area, Amlekhganj is the better choice for the station 1.
In this phase the pipeline will reach to the kathmandu from Amlekhganj. Kirtipur will be the best place to construct station 2 (main station ) with all the components of pipeline system.
Phase 3, 4 and 5
In these phase petroleum pipeline will be constructed upto Itahari, Pokhara and Birendranagar respectively as shown below.
Overall pipeline network of Nepal
Finally the petroleum pipeline network all over the nation looks like this :
At last
"YES, I HAVE DREAMED IT.
(Please, ask me the questions about this project so that I can make more study, generete more ideas and make it more effective.)