Wednesday, September 28, 2016

HOW FAR I HAVE REACHED WITH MY 5 RESOLUTIONS OF THE YEAR 2073 ??

Well, it's wonderful to write in blog after long time !!
I had made five resolutions for the year 2073 on the very first day of this year. I wanna give a brief summary of what I have done and achieved till this date.

1) Gas and Petroleum Pipeline System in Nepal (GPPS)
I studied about both the Gas and Petroleum Pipeline System and its design process. I watched lots of documentries of biggest pipeline network on earth. Its not that easy as said to construct pipelines in Nepal. Its takes a lot of time, money and materials.
Watch ALASKA PIPELINE, its the best documentry.

Many people think it's impossible but I seriously don't think its impossible. In addition to this Petroleum and Gas are very much necessary to grow and build this nation for centuries to come though we have huge potential in hydropower.
Raxual-Amlekjung  ( Phase 1) petroleum pipeline is going to start after some days. I am going to link my research with this phase if it starts on time. And in phase 2 ( Amlekhjung-Kathmandu), I wish to work being an Engineer not as observer.

Also, Solid Waste Management Project is going on. The main aim of this project is to conclude whether we can generate the gas for economical use by processing the waste collected from KTM valley or not.

2) Politics and social work
College life don't give much time to involve in any political and social events. Though I managed to be the part of the Dr. KC campaign against corruption and Educational Revolution.




Also I tried to raise the voice with a tag " पुनर्निर्माण कहाँ पुग्यो सरकार ?? ". I made some videos and urged other to do the same which was my unsuccessful try. I will be back again with this issue soon.
Also, I will continue to go in any campaign and programs which are for good cause for the rest of the year.

3) Literature
I wrote some poems and recorded 2-3 in videos. It was nice to hear the beautiful comments and appreciation from friends and  families.
About my " Upanyas", I haven't started yet. I have made a rough draft of it. I will start it after the vacation and by the end of Falgun, it should finish.

4) Videos, blog and Youtube
Growing in Youtube is so hard. I have already made more than 40+ videos but all of them with double digit views. Acutally I haven't shared my youtube videos so extensively, haven't requested to suscribe my channels and forced anyone to view any videos. Also, the contents of my videos are random, they are of low quality and most of them are very short. There are so many reasons .....
SUSCRIBE HERE

Blogging is good. Its the place where I share my ideas. I will keep doing this untill I'l have a personal website.
Facebook is good place to show your work and creation. Its hard if there is no support from the friends and families.
To my friends : To share my videos is like " मुटु माथी ढुंगा राखी, share गर्नु पर्या छ " !!!
My videos got 0 share from friends and families though some of them were good and informative.
No hard feelings, now you people (my friends) will no longer be my friends, you will be my family.
A COMMON MAN family !! I wish to get maximum support from all of you in coming days.

5) www.weworkforfree.com
This is the concept that always rings around me. I always think about this but I haven't got the best output yet with a clear idea.
I will work on it with more research and calculation. For this I need a group of people who are willing to work for free for some period of time. They should be good at graphics designing, web designing and other computing aspects.
Making site and starting the work is later part.

ITS GOOD. TILL NOW, ITS BEEN A LEARNING PHASE. NOW, THE ACTUAL WORK HAS TO BE STARTED.LET'S KEEP GOING.
I WANT TO THANK ALL MY FRIENDS AND OTHER PEOPLE WHO HAS BEEN HELPING ME AND GUIDING ME.
PEACE !!

Sunday, September 4, 2016

Components of Plate Girder

Plate girders are essentially the I beam fabricated mainly by the plate. Angle section are usually used to connect the flange plate and web plate. While in welded connection flange plates are directly welded with the web plate.

The components of the Plate Girder are:
1) Web Plate
2) Flange Plate and their Curtailment
3) Flange angles
4) Web Splice plates
5) Flange Splice plates
6) Longitudinal or horizontal stiffners
7) Transverse or vertical stiffners
8) Bearing stiffners
9) End bearing